The Town of Lapel, through the Town Board, desires to amend the current Fee Schedule as established in Ordinance No. 4-2009, and amended by Ordinance No. 5-2010 & Ordinance 1-2017, that fee schedule including all permit schedules of fees.
BE IT ORDAINED, by the Town Board of Lapel, that Ordinance No. 4-2009 and Ordinance No, 5-2010 and Ordinance No. 1-2017 are now amended and the fees adopted are as follows:
PROPOSED FEE SCHEDULE
- Site Development Plan Review, $1.05 rate of consultant to review plan
- PUD Concept Plan, $1,200 + $50
- PUD Ordinance, $750 + $50 per acre.
PUD Variance, $500 + $50 per acre. - Rezoning (zone Map amendment), $325
- Special Use Petitions, $300
- Appeal $0 + legal notice
- Administrative Plat Review, $200 + $50 per lot
- Major Subdivision Sketch Plan Review 4 lots or less, $400 + $35 per lot
- Major Subdivision Sketch Plan Review 5 or more lots, $600 + $30 per lot
- Waiver of Subdivision Regulations, $250 per waiver
- Re-Plat Review, $100 + $50 per lot
Single Family Dwelling Units (Building Permit)
- $400 + $0.10 per sq ft.
Two Family Dwelling Units (Building Permit)
- $400 + $0.10 per sq ft.
Multi Family (Building Permit)
- $400 + $50 per unit + $0.10 per sq ft.
Commercial (Building Permit)
- 600 + $0.15 per sq.ft.
Industrial (Building Permit)
- $600 + $0.15 per sq.ft.
Certificate of Occupancy
- 1-2 Family Dwelling $50
- Multi-Family Dwelling $100
- Commercial / Industrial $100
Additions
- 1-2 Family dwelling $150 + 0.10 per sq. ft.
- Multi-Family $250 + $0.10 per sq ft.
- Non-Residential $250 + $0.10 per sq ft.
Remodels
- 1-2 Family Dwelling $100 + $0.15 per sq. ft.
- Multi-Family $125 + $100 per unit + $0.15 per sq. ft.
- Non-Residential $350 + $0.15 per sq. ft.
Detached Garages, Pole Barnes and Accessory Structures
- Under 100 sq. ft. AND no foundation, $0
- 100 sq. ft. and above, $100 + $0.10 per sq. ft.
- In-ground Swimming Pool (filtered), $100
- Above Ground (filtered, with electric), $50
- Spas (with electric), $50
- Decks, $50 over 50 sq ft.
- Fences, $50
- Driveway $50 Residential, Non-Residential $100
Cellular Facilities
- New Tower $750
- Additional or Modification $250
Improvement Location / Structural Permits
- Residential
- Foundation Permit, $100
- Roofing Permit, $50
- Electric $75
- Plumbing, HVAC Permit, $50
- Driveway, $2
- Curb-cut Permit, $25
- Combination
- 1-2 Family Dwelling $100
- Multi-Family $100 + $50 per unit.
- Non-Residential $200
- Demolition
- Residential $100
- Non-Residential $200 + $50 per additional building
- Accessory Structure $50
Signs
- Signs (permanent with base), $50 + $1 per sq. ft. over 16 sq. ft
- Sign violation, $50
Additional Fees
- Temporary Use, $50
- Additional Inspection due to Incomplete Work $50
- Amendment to approved permit $25
- Stop Work Order Violation $100
- Legal Notice Requirement $25