Last updated January 2022. For questions on planning fees contact Town Hall.
A. Building Permit |
|
1. New Construction |
|
a. One or Two Family Dwelling |
$400 + $0.10 per sq. ft. |
b. Multi-Family Dwelling |
$400 + $50 per unit + $0.10 per sq. ft. |
c. Non-Residential |
$600 + $0.15 per sq. ft. |
|
|
2. Additions |
|
a. One or Two Family Dwelling |
$150 + $0.10 per sq. ft. |
b. Multi-Family Dwelling |
$250 + $0.10 per sq. ft. |
c. Non-Residential |
$250 + $0.10 per sq. ft. |
|
|
3. Remodeling |
|
a. One or Two Family Dwelling |
$100 + $0.10 per sq. ft. |
b. Multi-Family |
$100 + $50 per unit + $0.10 per sq. ft. |
c. Non-Residential |
$200 + $0.10 per sq. ft. |
|
|
4. Accessory Structures |
|
a. 0-100 sq. ft. |
No permit required |
b. Over 101 sq. ft. |
$100 + $0.10 per sq. ft. |
|
|
5. Pools |
|
a. Above Ground 18” deep & 8 ft. wide (filtered & electric) |
$50 |
b. In ground |
$100 |
|
|
6. Decks |
|
a. Over 150 sq. ft. |
$50 |
|
|
7. Fences |
|
a. Maximum of 6ft height |
$50 |
|
|
B. Improvement Location Permit |
|
a. Roof |
$50 |
b. Roof & Siding |
$65 |
c. Electrical (Includes 1 inspection) |
$75 |
d. Plumbing/HVAC (Includes 1 inspection) |
$50 |
e. Driveway Residential |
$50 |
f. Driveway Non-Residential |
$100 |
|
|
C. Telecommunication Towers |
|
a. New Tower |
$750 |
b. Addition or Modification |
$250 |
|
|
D. Sign Permit |
|
a. Temporary (30 days) |
$25 |
b. Permanent under 16 sq. ft. |
$50 |
c. Permanent over 16 sq. ft. |
$50 + $1 per sq. ft. |
|
|
E. Other Permits |
|
1. Certificate of Occupancy |
|
a. One or Two Family Dwelling |
$50 |
b. Multi-Family Dwelling |
$100 |
c. Non-Residential |
$100 |
2. Demolition |
|
a. Residential |
$100 |
b. Non-Residential |
$200 + $50 per additional building |
c. Accessory Building |
$50 |
3. Temporary Use |
$50 |
4. Amendment to an Approved Permit |
$25 |
5. Removal of a “Stop Work Order” |
$100 |
|
|
F. Additional Inspections as determined by the building inspector – Each |
$50 |
|
|
G. Major Subdivision (4 lots or less) |
|
1. Primary Plat |
$400 + $30 per lot |
2. Secondary Plat |
$400 + $30 per lot |
|
|
H. Major Subdivision ( 5 lots or more) |
|
1. Primary Plat |
$600 + $30 per lot |
2. Secondary Plat |
$600 + $30 per lot |
|
|
|
|
|
|
|
|
I. Planned Unit Development |
|
1. PUD Concept Plan |
$1,200 |
2. PUD Ordinance |
$750 + $50 per acre |
3. PUD Variance |
$500 + $50 per affected acre |
|
|
J. Administrative Plat Review |
$200 + $50 per lot |
|
|
K. Site Development Plan |
1.05 rate of consultant |
|
|
L. Replat |
$100 + $50 per lot |
|
|
M. Variance |
$200 + $50 per additional variance |
1. Appeal |
$0 + Cost of Legal Notice |
|
|
N. Rezone |
$325 |
|
|
O. Legal Notice Requirement |
$25 |
|
|
P. Tap Fees |
|
1. Gas Tap |
$750 |
2. Water Tap |
$1,000 |
3. Sewer Tap |
$1,250 |
|
|
Q. Impact Fees |
|
1. Water Impact |
$2,000 |
2. Sewer Impact |
$2,000 |