Sign In

Fee Schedule

 Last updated January 2022. For questions on planning fees contact Town Hall.

A. Building Permit       

 

1.      New Construction

 

a.      One or Two Family Dwelling

$400 + $0.10 per sq. ft.

b.      Multi-Family Dwelling

$400 + $50 per unit + $0.10 per sq. ft.

c.       Non-Residential

$600 + $0.15 per sq. ft.

 

 

2.      Additions

 

a.      One or Two Family Dwelling

$150 + $0.10 per sq. ft.

b.      Multi-Family Dwelling

$250 + $0.10 per sq. ft.

c.       Non-Residential

$250 + $0.10 per sq. ft.

 

 

3.      Remodeling

 

a.      One or Two Family Dwelling

$100 + $0.10 per sq. ft.

b.      Multi-Family

$100 + $50 per unit + $0.10 per sq. ft.

c.       Non-Residential

$200 + $0.10 per sq. ft.

 

 

4.      Accessory Structures

 

a.      0-100 sq. ft.

No permit required

b.      Over 101 sq. ft.

$100 + $0.10 per sq. ft.

 

 

5.      Pools

 

a.      Above Ground 18” deep & 8 ft. wide (filtered & electric)

$50

b.      In ground

$100

 

 

6.      Decks

 

a.      Over 150 sq. ft.

$50

 

 

7.      Fences

 

a.      Maximum of 6ft height

$50

 

 

B. Improvement Location Permit

 

a.      Roof

$50

b.      Roof & Siding

$65

c.       Electrical (Includes 1 inspection)

$75

d.      Plumbing/HVAC (Includes 1 inspection)

$50

e.       Driveway Residential

$50

f.        Driveway Non-Residential

$100

 

 

C. Telecommunication Towers

 

a.      New Tower

$750

b.      Addition or Modification

$250

 

 

D. Sign Permit

 

a.      Temporary (30 days)

$25

b.      Permanent under 16 sq. ft.

$50

c.       Permanent over 16 sq. ft.

$50 + $1 per sq. ft.

 

 

E. Other Permits

 

1.      Certificate of Occupancy

 

a.      One or Two Family Dwelling

$50

b.      Multi-Family Dwelling

$100

c.       Non-Residential

$100

2.      Demolition

 

a.      Residential

$100

b.      Non-Residential

$200 + $50 per additional building

c.       Accessory Building

$50

3.      Temporary Use

$50

4.      Amendment to an Approved Permit

$25

5.      Removal of a “Stop Work Order”

$100

 

 

F. Additional Inspections as determined by the building inspector – Each

$50

 

 

G. Major Subdivision (4 lots or less)

 

1.      Primary Plat

$400 + $30 per lot

2.      Secondary Plat

$400 + $30 per lot

 

 

H. Major Subdivision ( 5 lots or more)

 

1.      Primary Plat

$600 + $30 per lot

2.      Secondary Plat

$600 + $30 per lot

 

 

 

 

 

 

 

 

I. Planned Unit Development

 

1.      PUD Concept Plan

$1,200

2.      PUD Ordinance

$750 + $50 per acre

3.      PUD Variance

$500 + $50 per affected acre

 

 

J. Administrative Plat Review

$200 + $50 per lot

 

 

K. Site Development Plan

1.05 rate of consultant

 

 

L. Replat

$100 + $50 per lot

 

 

M. Variance

$200 + $50 per additional variance

1.      Appeal

$0 + Cost of Legal Notice

 

 

N. Rezone

$325

 

 

O. Legal Notice Requirement

$25

 

 

P. Tap Fees

 

1.      Gas Tap

$750

2.      Water Tap

$1,000

3.      Sewer Tap

$1,250

 

 

Q. Impact Fees

 

1.      Water Impact

$2,000

2.      Sewer Impact

$2,000