Fee Schedule

 Last updated August 2025. For questions on planning fees contact Town Hall.

A. Building Permit       

 

1.      New Construction

 

a.      One or Two Family Dwelling

$400 + $0.10 per sq. ft.

b.      Multi-Family Dwelling

$400 + $50 per unit + $0.10 per sq. ft.

c.       Non-Residential

$600 + $0.15 per sq. ft.

 

 

2.      Additions

 

a.      One or Two Family Dwelling

$150 + $0.10 per sq. ft.

b.      Multi-Family Dwelling

$250 + $0.10 per sq. ft.

c.       Non-Residential

$250 + $0.10 per sq. ft.

 

 

3.      Remodeling

 

a.      One or Two Family Dwelling

$100 + $0.10 per sq. ft.

b.      Multi-Family

$100 + $50 per unit + $0.10 per sq. ft.

c.       Non-Residential

$200 + $0.10 per sq. ft.

 

 

4.      Accessory Structures

 

a.      0-100 sq. ft.

No permit required

b.      Over 101 sq. ft.

$100 + $0.10 per sq. ft.

 

 

5.      Pools

 

a.      Above Ground 18” deep & 8 ft. wide (filtered & electric)

$50

b.      In ground

$100

 

 

6.      Decks

 

a.      Over 150 sq. ft.

$50

 

 

7.      Fences

 

a.      Maximum of 6ft height

$50

 

 

B. Improvement Location Permit

 

a.      Roof

$50

b.      Roof & Siding

$65

c.       Electrical (Includes 1 inspection)

$75

d.      Plumbing/HVAC (Includes 1 inspection)

$50

e.       Driveway Residential

$50

f.        Driveway Non-Residential

$100

g.       Site Work Permit

$100 App Fee + Plan Review Fee

 

 

C. Telecommunication Towers

 

a.      New Tower

$750

b.      Addition or Modification

$250

 

 

D. Sign Permit

 

a.      Temporary (30 days)

$25

b.      Permanent under 16 sq. ft.

$50

c.       Permanent over 16 sq. ft.

$50 + $1 per sq. ft.

 

 

E. Other Permits

 

1.      Certificate of Occupancy

 

a.      One or Two Family Dwelling

$50

b.      Multi-Family Dwelling

$100

c.       Non-Residential

$100

2.      Demolition

 

a.      Residential

$100

b.      Non-Residential

$200 + $50 per additional building

c.       Accessory Building

$50

3.      Temporary Use

$50

4.      Amendment to an Approved Permit

$25

5.      Removal of a “Stop Work Order”

$100

 

 

F. Additional Inspections as determined by the building inspector – Each

$50

 

 

G. Major Subdivision (4 lots or less)

 

1.      Primary Plat

$400 + $30 per lot

2.      Secondary Plat

$400 + $30 per lot

3.      Waiver

$75

 

 

H. Major Subdivision ( 5 lots or more)

 

1.      Primary Plat

$600 + $30 per lot

2.      Secondary Plat

$600 + $30 per lot

3.      Waiver

$75

 

 

I. Planned Unit Development

 

1.      PUD Concept Plan

$1,200

2.      PUD Preliminary Plan

$1,200 + $50 per acre

3.      PUD Ordinance

$750 + $50 per acre

4.      PUD Final Detailed

$750 + $50 per acre

5.      PUD Amendment (text)

$500

6.      PUD Amendment (other)

$500 + $50 per acre

7.      PUD Variance

$500 + $50 per affected acre

 

 

J. Administrative Plat Review

 

1.      Preliminary Plat

$400 + $30 per lot

2.      Final Plat

$300 + $30 per lot

3.      Waiver

$50 per waiver

 

 

K. Plat Amendments

 
1.      Major Subdivision Re-Plat $400 + $30 per lot
2.      Administrative Subdivision Re-Plat $200 + $30 per lot
3.      Plat Vacation $400
4.      Certificate of Correction on a Plat $200
   

L. Site Development Plan

1.05 x rate of consultant

 

 

M. Subdivision Construction Plan

$200 Application Fee + Plan Review Fee

 

 

N. Variance

 

1.      Variance of Develpment Standard

 

         a.      Residential

$300 + $50 Per Additional Variance

         b.      Non-Residential

$500 + $50 Per Additional Variance

2.      Special Use

 

        a.      Residential

$300 + $50 Per Additional Variance

         b.      Non-Residential

$500 + $50 Per Additional Variance

         c.      Administrative Appeal

$200

 

 

O. Rezoning

 

1.      Rezone

$600 + $50 per acre

2.      Change to Zoning Commitments $250
3.      Legal Notice Requirement $25

 

 

P. Tap Fees

 

1.      Gas Tap

$750

2.      Water Tap

$1,000

3.      Sewer Tap

$1,250

 

 

Q. Impact Fees

 

1.      Water Impact

$2,000

2.      Sewer Impact

$2,000

 

TABLE 1

PLAN REVIEW FEE (Based on Number of Sheets)

1.    1 to 5 Sheets

$640

2.    6 to 9 Sheets

$960

3.    10 to 19 Sheets

$1600

4.    20 to 39 Sheets

$2240

5.    40 to 59 Sheets

$2880

6.    60 and Above

$3520

 

*Additional Amendments: Second and further sets of amended plans shall be submitted with an additional plan review fee per the number of revised pages at a rate of $80 per page.